![]() According to the results of comparative tests of the prototypes presented, the army should make the final choice of the machine for mass production and in 2022 Finn by the end of the 2021 fiscal year. Prototype delivery should be started in 14 months and completed in 18-19 months from the date of receipt of the contract. BAE Systems and General Dynamics selected by the US Army for the further development of MPF combat vehiclesĪs representatives of the US Army were told on December 17, 2018, BAE Systems and General Dynamics were selected as final bidders for developing tracked combat vehicles under the Mobile Protected Firepower (MPF) program on a competitive basis to create a kind of light tank with cannon armament for the American Army.īAE Systems and General Dynamics received contracts from the US Army worth $ 375.9 and $ 335 million, respectively, each for building and supplying 12 prototypes for testing their own version of the MPF machine for the design and development phase (Engineering, Manufacturing, and Development - EMD).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |